Перевод: с английского на русский

с русского на английский

to fill up to grade

См. также в других словарях:

  • Fill dirt — is earthy material which is used to fill in a depression or hole in the ground or create mounds or otherwise artificially change the grade or elevation of real property.[1] Fill dirt is usually subsoil (soil from beneath the top soil) and… …   Wikipedia

  • Grade (slope) — d = run Δh = rise l = slope length α = angle of inclination This article is for the grade of a topographic feature or constructed element, for other uses see: Slope (disambiguation) The grade (also called slope, incline, gradient, pitch or rise)… …   Wikipedia

  • Fill trestle — A fill trestle is a bridge that is built to provide a scaffolding for the construction of a fill or an earthen dam. Typically, the trestle is built across the valley and a railroad track is laid across the trestle. Specially designed side dumping …   Wikipedia

  • grade — I (New American Roget s College Thesaurus) n. level, quality, class; rank, standing; gradation, slope, tilt, slant. See obliquity, degree. II (Roget s IV) n. 1. [An incline] Syn. hill, slope, inclined plane, gradient, slant, inclination, pitch,… …   English dictionary for students

  • grade — Noun: An inclination, as in a highway. The lay of the land in reference to the elevation of adjoining lands. The amount of difference between the grade line and a level or horizontal line. Davies v East Saginaw, 66 Mich 37, 39. A degree or rank,… …   Ballentine's law dictionary

  • fill the bill — Synonyms and related words: advance, advantage, answer, avail, be OK, be equal to, be handy, be of use, be right, bear, befit, befitting, benefit, bestead, do, do it, do the job, do the trick, fit, forward, fulfill, get by, give good returns, go… …   Moby Thesaurus

  • Cut and fill — A mass haul diagram where land and rock cuts are hauled to fills In earthmoving, cut and fill is the process of constructing a railway, road or canal whereby the amount of material from cuts roughly matches the amount of fill needed to make… …   Wikipedia

  • Make the Grade — Format Children s game show Presented by Lew Schneider (1989 1990) Robb Edward Morris (1991) Narrated by Maria Milito Country of origin United States …   Wikipedia

  • JumpStart Advanced 2nd Grade — Infobox VG title= JumpStart Advanced 2nd Grade caption = The 2007 cover of JumpStart Advanced 2nd Grade developer = Knowledge Adventure publisher = Knowledge Adventure series= JumpStart released = 2002 designer = engine = genre = Educational… …   Wikipedia

  • JumpStart 2nd Grade (1996 version) — Infobox VG title= JumpStart 2nd Grade caption = The 2000 cover of JumpStart 2nd Grade (1996 version) developer = Knowledge Adventure publisher = Knowledge Adventure series= JumpStart released = 1996 designer = engine = genre = Educational modes …   Wikipedia

  • Blow fill seal — technology was originally developed in Europe in the 1930 s and was introduced in the United States in the 1960 s, but has just recently become more prevalent as it is now considered the superior form of aseptic processing by the Food and Drug… …   Wikipedia

Поделиться ссылкой на выделенное

Прямая ссылка:
Нажмите правой клавишей мыши и выберите «Копировать ссылку»